Statistical performance indicators (SPI): Pillar 5 data infrastructure in Zambia
Zambia: Statistical performance indicators (SPI): Pillar 5 data infrastructure was 50 scale 0-100 in 2024. ▲ Rising
Statistical performance indicators (SPI): Pillar 5 data infrastructure in Zambia, 2016–2024
Source: Statistical Performance Indicators, World Bank (WB). Measured in scale 0-100.
Analysis
The most recent figure for statistical performance indicators (spi): pillar 5 data infrastructure in Zambia is 50 scale 0-100, measured in 2024. That is the highest value across all 9 years on record.
The figure is up 25.0% over ten years.
Over the whole period, statistical performance indicators (spi): pillar 5 data infrastructure in Zambia peaked at 50 scale 0-100 in 2023 and was at its lowest, 40 scale 0-100, in 2016.
That places Zambia 137th out of 191 countries with data for 2024, putting it in the middle of the range.
Averages by decade
| Decade | Average | Lowest | Highest | Years |
|---|---|---|---|---|
| 2010s | 40 scale 0-100 | 40 scale 0-100 | 40 scale 0-100 | 4 |
| 2020s | 46 scale 0-100 | 40 scale 0-100 | 50 scale 0-100 | 5 |
Countries ranked near Zambia
- 137 Angola 50 scale 0-100 compare
- 137 Chad 50 scale 0-100 compare
- 137 Congo 50 scale 0-100 compare
- 137 Djibouti 50 scale 0-100 compare
- 137 Gambia 50 scale 0-100 compare
- 137 Guinea-Bissau 50 scale 0-100 compare
- 137 India 50 scale 0-100 compare
- 137 Iran 50 scale 0-100 compare
- 137 Mali 50 scale 0-100 compare
- 137 Nepal 50 scale 0-100 compare
- 137 Samoa 50 scale 0-100 compare
- 137 San Marino 50 scale 0-100 compare
- 137 Trinidad and Tobago 50 scale 0-100 compare
More public sector data for Zambia
- Arms imports 1.00 million SIPRI trend indicator values (2024)
- Tax revenue 18.8% (2024)
- Taxes on income, profits and capital gains 35.1% (2024)
- Taxes on goods and services 31.8% (2024)
- Net investment in nonfinancial assets 5.2% (2024)
- Net lending (+) / net borrowing (-) -3.2% (2024)
- Interest payments 28.3% (2024)
- Grants and other revenue 25.3% (2024)
- Interest payments 26.5% (2021)
- Other taxes 2.5% (2024)
Frequently asked questions
- What is statistical performance indicators (spi): pillar 5 data infrastructure in Zambia?
- Statistical performance indicators (spi): pillar 5 data infrastructure in Zambia was 50 scale 0-100 in 2024, according to Statistical Performance Indicators, World Bank (WB).
- What is the highest statistical performance indicators (spi): pillar 5 data infrastructure recorded in Zambia?
- The highest recorded value was 50 scale 0-100 in 2023.
- What is the lowest statistical performance indicators (spi): pillar 5 data infrastructure recorded in Zambia?
- The lowest recorded value was 40 scale 0-100 in 2016.
- How does Zambia rank for statistical performance indicators (spi): pillar 5 data infrastructure?
- Zambia ranks 137th out of 191 countries with data for 2024.
- Is statistical performance indicators (spi): pillar 5 data infrastructure rising or falling in Zambia?
- Over the last ten years it is up 25.0%. The long-run trend across the full record is rising.
- Where does this Zambia data come from?
- The figures come from Statistical Performance Indicators, World Bank (WB), published as part of Statistical performance indicators (SPI): Pillar 5 data infrastructure score (scale 0-100). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 9 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The data infrastructure pillar overall score measures the hard and soft infrastructure segments, itemizing essential cross cutting requirements for an effective statistical system. The segments are: (i) legislation and governance covering the existence of laws and a functioning institutional framework for the statistical system; (ii) standards and methods addressing compliance with recognized frameworks and concepts; (iii) skills including level of skills within the statistical system and among users (statistical literacy); (iv) partnerships reflecting the need for the statistical system to be inclusive and coherent; and (v) finance mobilized both domestically and from donors.