Lead time to import, median case in Africa Eastern and Southern

Africa Eastern and Southern: Lead time to import, median case was 6.44 days in 2018. ▼ Falling

Latest (2018)
6.44 days
Change on year
down 4.8%
All-time high
12.45 days
in 2012
All-time low
4.8 days
in 2014
Years of data
6
2007–2018

Lead time to import, median case in Africa Eastern and Southern, 2007–2018

02.557.51012.52007201220182007: 9.8 days2010: 5.7 days2012: 12.5 days2014: 4.8 days2016: 6.8 days2018: 6.4 days

Source: Logistic Performance Index Surveys, World Bank (WB). Measured in days.

Analysis

In 2018, lead time to import, median case in Africa Eastern and Southern stood at 6.44 days.

That represents a change of down 4.8% on the previous year and down 34.1% over ten years.

Over the whole period, lead time to import, median case in Africa Eastern and Southern peaked at 12.45 days in 2012 and was at its lowest, 4.8 days, in 2014.

Averages by decade

DecadeAverage LowestHighest Years
2000s 9.78 days 9.78 days 9.78 days 1
2010s 7.22 days 4.8 days 12.45 days 5

More private sector data for Africa Eastern and Southern

All data for Africa Eastern and Southern →

Frequently asked questions

What is lead time to import, median case in Africa Eastern and Southern?
Lead time to import, median case in Africa Eastern and Southern was 6.44 days in 2018, according to Logistic Performance Index Surveys, World Bank (WB).
What is the highest lead time to import, median case recorded in Africa Eastern and Southern?
The highest recorded value was 12.45 days in 2012.
What is the lowest lead time to import, median case recorded in Africa Eastern and Southern?
The lowest recorded value was 4.8 days in 2014.
Is lead time to import, median case rising or falling in Africa Eastern and Southern?
Over the last ten years it is down 34.1%. The long-run trend across the full record is falling.
Where does this Africa Eastern and Southern data come from?
The figures come from Logistic Performance Index Surveys, World Bank (WB), published as part of Lead time to import, median case (days). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Lead time to import, median case (days)
Unit
days
Source
Logistic Performance Index Surveys, World Bank (WB)
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
120 places, 688 data points, 2007–2018
Last refreshed

Lead time to import is the median time (the value for 50 percent of shipments) from port of discharge to arrival at the consignee. Data are from the Logistics Performance Index survey. Respondents provided separate values for the best case (10 percent of shipments) and the median case (50 percent of shipments). The data are exponentiated averages of the logarithm of single value responses and of midpoint values of range responses for the median case.