Private Sector in Gabon

210 indicators covering private sector for Gabon.

IndicatorLatest Year10-yr change Rank
Dealing with construction permits (DB06-15 methodology) - Score 70.45 2014 up 16.5% 69th
Getting Credit total score 8 DB05-14 methodology 2013 up 166.7% 101st
Getting credit (DB05-14 methodology) - Score 50 2013 up 166.7% 101st
Getting credit: Depth of credit information index (0-6) 2 DB05-14 methodology 2013 114th
Getting credit: Depth of credit information index (0-6) (DB05-14) 33.33 2013 114th
Getting credit: Strength of legal rights index (0-10) (DB05-14) 60 2013 up 100.0% 76th
Getting credit: Strength of legal rights index (0-10) 6 DB05-14 methodology 2013 up 100.0% 76th
Getting electricity (DB10-15 methodology) - Score 54.84 2014 up 11.2% 160th
Global: Ease of doing business score 53.07 DB10-14 methodology 2013 136th
Number of female sole proprietors 3,265 2024 up 82.8% 48th
Share of female sole proprietors 31.7% 2024 up 3.3% 57th
Number of male sole proprietors 7,043 2024 up 74.5% 49th
Share of male sole proprietors 68.3% 2024 down 1.4% 22nd
Number of female directors 582 2024 up 130.0% 54th
Share of female directors 24.5% 2024 up 34.7% 36th
Number of male directors 1,791 2024 up 57.5% 58th
Share of male directors 75.5% 2024 down 7.7% 36th
Minimum capital for starting a business 22.3% 2012 down 46.3% 23rd
Enforcing contracts, cost 34.3% 2012 unchanged 30th
Getting credit, legal rights index 6 2012 up 100.0% 15th
Cost of registering property 10.5% 2012 unchanged 20th
Closing a business, cost 15.0% 2012 unchanged 29th
Closing a business, time 5 years 2012 unchanged 5th
Closing a business, recovery rate 15.2 cents on the dollar 2012 up 9.4% 32nd
Protecting investors, director liability index 1 2012 unchanged 32nd
Protecting investors, investor protection index 3.3 2012 unchanged 39th
Protecting investors, shareholder suits index 3 2012 unchanged 40th
Dealing with construction permits, cost 79.3% 2012 down 31.9% 45th
Dealing with construction, procedures 13 number 2012 unchanged 29th
Time required to deal with construction permits 243 days 2012 unchanged 11th