Private Sector in Algeria

211 indicators covering private sector for Algeria.

IndicatorLatest Year10-yr change Rank
Getting credit: Strength of legal rights index (0-10) 3 DB05-14 methodology 2013 unchanged 146th
Getting electricity (DB10-15 methodology) - Score 59.98 2014 down 3.3% 143rd
Global: Ease of doing business score 48.74 DB10-14 methodology 2013 152nd
Getting electricity: Minimum outage time (in minutes) 3 DB16-20 methodology 2019 unchanged 48th
Getting electricity: System average interruption duration index 4.24 DB16-20 methodology 2019 down 29.5% 45th
Getting electricity: System average interruption frequency index 9.85 DB16-20 methodology 2019 up 10.8% 20th
Number of female sole proprietors 551 2018 66th
Share of female sole proprietors 6.6% 2018 77th
Number of male sole proprietors 7,769 2018 46th
Share of male sole proprietors 93.4% 2018 2nd
Number of female directors 253 2024 up 130.0% 58th
Share of female directors 10.1% 2024 up 6.8% 65th
Number of male directors 2,262 2024 up 113.8% 56th
Share of male directors 89.9% 2024 down 0.7% 7th
Number of female business owners 3,565 2024 up 94.6% 30th
Share of female business owners 14.8% 2024 up 0.9% 63rd
Number of male business owners 20,585 2024 up 92.5% 25th
Share of male business owners 85.2% 2024 down 0.2% 10th
Minimum capital for starting a business 27.2% 2012 down 62.8% 21st
Enforcing contracts, cost 21.9% 2012 unchanged 43rd
Getting credit, legal rights index 3 2012 unchanged 38th
Cost of registering property 7.1% 2012 down 5.3% 31st
Closing a business, cost 7.0% 2012 unchanged 44th
Closing a business, time 2.5 years 2012 unchanged 31st
Closing a business, recovery rate 41.7 cents on the dollar 2012 unchanged 4th
Protecting investors, director liability index 6 2012 unchanged 10th
Protecting investors, investor protection index 5.3 2012 unchanged 14th
Protecting investors, shareholder suits index 4 2012 unchanged 31st
Dealing with construction permits, cost 54.6% 2012 up 31.2% 47th
Dealing with construction, procedures 19 number 2012 unchanged 7th
Time required to deal with construction permits 281 days 2012 unchanged 9th